Petronas Upgrades to Fluenta
Petronas Upgrades to Fluenta
In 2020, Malaysia’s government-owned oil and gas company, Petronas, stated their aspirations to achieve net zero emissions by 2050 with the application of new technologies to reduce emissions. This included a focus on reducing and ultimately eliminating routine flaring. To reduce flare gas volumes, the first step Petronas took was to ensure accurate and reliable […]
Case Studies – Weathering the Cold
Some clients are located in extremely cold regions or have cryogenic process conditions which make accurate measurement very difficult as both of these put significant stress on the meters.
Case Studies – Quick, Seamless Upgrades
The client was suffering due to their exist flare gas meters being unable to cope with the process conditions and malfunctioning and providing inconsistent and incorrect readings.
Case Studies – Quick Turnaround
Indorama Venture’s olefins plant required the installation of two flare gas meters to meet their environmental reporting requirements.
Case Studies – The Dangote Refinery
Challenge We were asked to install measurement solutions for a customer in Nigeria in a range of pipes including both a 65” and a 90” flare line, both with potentially high levels of CO2 Solution It’s important to keep the tip-to-tip sensor distance within certain limits because high CO2 would absorb transmitted signal. It’s also […]
Case Studies – Lack of Space
Challenge Ultrasonic flow meters require a certain amount of straight piping free from any obstructions such as bends, valves etc. for them to measure the flow accurately. In this case the flare left the knockout drum and went immediately to the underground channel leaving not enough straight piping for a flare meter to be installed. […]